Skip Nav Destination
Oilwell Drilling Engineering
ISBN:
9780791861875
No. of Pages:
512
Publisher:
ASME Press
Publication date:
2019
Early drilling rigs were built on site and left in place. Mobile drilling rigs, introduced in the 1950s (Figure 2-1), are transported by truck and set-up on site and then relocated for the next well. The most visible part of a drilling rig is its derrick, a structure that contains a hoisting arrangement, which includes a crown block and a traveling block. The pulley arrangement is designed to create a large mechanical advantage for hoisting equipment (drill pipe, casing, tubing, blow out control equipment, etc.) in and out of the hole.
Topics:
Drilling,
Drilling rigs,
Control equipment,
Derricks,
Drills (Tools),
Pipes,
Pulleys,
Trucks,
Tubing
2.1
Subsystems of Drilling Rigs
2.2Elements of Optimum Drilling
2.3Developing the Drilling Program
2.4Problems
2.5List of References
This content is only available via PDF.
You do not currently have access to this chapter.
Email alerts
Related Chapters
Research on Derrick Structure of JYD-1500 Full-Hydraulic Core Drill Rig
Geological Engineering: Proceedings of the 1 st International Conference (ICGE 2007)
Study on Screw Drill Wear When Drilling Low Carbon Stainless Steel and Accompanying Phenomena in the Cutting Zone
International Conference on Instrumentation, Measurement, Circuits and Systems (ICIMCS 2011)
Sampling Program
Guidebook for Waste and Soil Remediation: For Nonhazardous Petroleum and Salt Contaminated Sites
Historical Overview
History of Line Pipe Manufacturing in North America
Related Articles
A Dynamic Model for Rotary Rock Drilling
J. Energy Resour. Technol (June,1982)
Storm Warning
Mechanical Engineering (June,2006)
Testing Machine Learning Algorithms for Drilling Incidents Detection on a Pilot Small-Scale Drilling Rig
J. Energy Resour. Technol (December,2021)