Hydrotest is one of the most important inspection activities to assess the integrity of pipelines prior to starting transportation of hazardous liquids. If the pipeline is buried, and welds cannot be inspected visually for leak, it is required that the hydrotest pressure is held for 24 h to ensure that the pipeline is leak free. Ideally the pressure should remain constant, but this is practically impossible due to changes in temperature. Pressure and temperature of the pipelines are recorded continuously and evaluated at the end of the test. The pressure drop should be in line with the temperature drop based on compressibility relationship. However, nonconformance is expected due to accuracy of the individual instruments used to measure the pressure and temperature. It is then ambiguous to the evaluator whether the nonconformance is attributed to small leak or to instrument accuracy. In this paper, general uncertainty analysis with parametric study is used in the planning and designing phase of pressure test. The objective is to develop an appropriate acceptance criterion for the pressure test of buried pipelines. Actual field hydrotests are used to illustrate and validate the outcome of the analysis. The results show that high uncertainty values reduce the validity of the actual hydrotest. This is because the test would most probably pass regardless of the actual pressure drop measured.
Skip Nav Destination
e-mail: aqutub@kfupm.edu.sa
Article navigation
February 2011
Research Papers
Develop Acceptance Criteria of Pressure Test of Buried Pipeline Using Uncertainty Analysis
Amro M. Al-Qutub
Amro M. Al-Qutub
Department of Mechanical Engineering,
e-mail: aqutub@kfupm.edu.sa
King Fahd University of Petroleum & Minerals
, Dhahran 31261, Saudi Arabia
Search for other works by this author on:
Husain Al-Muslim
Amro M. Al-Qutub
Department of Mechanical Engineering,
King Fahd University of Petroleum & Minerals
, Dhahran 31261, Saudi Arabiae-mail: aqutub@kfupm.edu.sa
J. Pressure Vessel Technol. Feb 2011, 133(1): 011704 (8 pages)
Published Online: January 21, 2011
Article history
Received:
February 27, 2010
Revised:
July 3, 2010
Online:
January 21, 2011
Published:
January 21, 2011
Citation
Al-Muslim, H., and Al-Qutub, A. M. (January 21, 2011). "Develop Acceptance Criteria of Pressure Test of Buried Pipeline Using Uncertainty Analysis." ASME. J. Pressure Vessel Technol. February 2011; 133(1): 011704. https://doi.org/10.1115/1.4002263
Download citation file:
Get Email Alerts
Cited By
On the possibility of extending the crack length criterion in the master curve methodology
J. Pressure Vessel Technol
Investigation of Fracture Prediction Capability of XFEM and FEM using SENT Specimens
J. Pressure Vessel Technol
The Behavior of Elbow Elements at Pure Bending Applications Compared to Beam and Shell Element Models
J. Pressure Vessel Technol (February 2025)
Related Articles
Nonisothermal
Transient Flow in Natural Gas Pipeline
J. Appl. Mech (May,2008)
Critical Buckling Strain Equations for Energy Pipelines—A Parametric Study
J. Offshore Mech. Arct. Eng (August,2006)
Evaluation of “Marching Algorithms” in the Analysis of Multiphase Flow in Natural Gas Pipelines
J. Energy Resour. Technol (December,2008)
About the Influence of the Corrosion Defect Geometry on Repaired Pipes Stress Distribution
J. Pressure Vessel Technol (February,2021)
Related Chapters
DEVELOPMENTS IN STRAIN-BASED FRACTURE ASSESSMENTS - A PERSPECTIVE
Pipeline Integrity Management Under Geohazard Conditions (PIMG)
Natural Gas Transmission
Pipeline Design & Construction: A Practical Approach, Third Edition
Compressive Deformation of Hot-Applied Rubberized Asphalt Waterproofing
Roofing Research and Standards Development: 10th Volume